From: route@monster.com
Sent: Friday, April 15, 2016 10:19 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Gaudioso A. Sueno Jr.,ECE
Address: 216 Bloomfield Avenue Iselin, New Jersey 08830 Email : gsueno11@yahoo.com Mobile : 732-910-6324 Personnal Information Nationality:Filipino Gender:Male Marital Status:Married Language Known:English,Tagalog Educational
Attainment: Education:BS in Electronics and
Communication Engineering Notre
Dame of Marbel University Location:Koronadal,
South Cotabato ,
Philippines Date
Graduated:2000 Professional
Regulation Commission no. : Philippines License no. 22924 Seminar
and Training Attended Ø Approved Saudi
Aramco Telecoms QA/QC Ø Work Permit Receiver – Cold, Hot, Confined
Space, Release Ø Cisco IPSEC training for Banking Networks Ø VOIP , IP Operation , Routers
Training Ø CDMA 2000 Network Operation Training Ø DSL, IP , IPMLS , Bayantel Network (EDA) Ø Basic of Network, IP and DSL Connectivity Ø ICMS (Integrated Customer Management
System) IBM database – AS400 Platform Ø Mirosoft Office Proficient Professional
Experience February
2013 to April 2014 Al
Qahtani – Fisk Electric and Telephone Company Limited, Saudi Arabia Present
Company Position – Cost Engineer – Estimation Department Ø Attending Job
Explanation of Proponent for new Project Bidding Ø Conduct Site
Survey to evaluate the actual site Condition Ø Prepation of
actual Bidding documents, Commercial and Technical Ø Review,Verify and
Evaluation of Project Package, this include Drawings, Technical Condition,
Pricing prior to submission of Bid Ø Review Materials
and Installations procedures upon Materials Receiving stage. Ø Execute Material
Take-off base on reference drawing, actual site condition survey. March
2012 to January 2013 Al
Qahtani – Fisk Electric and Telephone Company Limited, Saudi Arabia Position –
Communication QA/QC Project:
Industrial System Upgrade for Security – Amendment 4 Under NORTHROP GRUMMAN Mission Saudi
Arabia Project
Summary : Upgrade of Saudi Aramco Oil Company Main
Security System, Installation and Integration of new equipment such as
CCTV Camera(PTZ and Fix), Microwave Intrusion Detection(MIDS), Fiber Optics
Vibration Detection and replacement of transmission equipment in five
Regional Security Command Center. Ø Preparation of
Material approval document prior to installation Ø Site Installation
inspection, ensure workmanship is within Saudi Aramco Standards Ø Preparation of
RFI(Request for Inspection) using QMIS Ø Drawing review and
doing the redline for As-Built Ø Conduct proper
Equipment Installation as per Proponent installation standards. Ø Review methods of
Installations ensuring standards are being followed. March
2010 to February 2012 Al
Qahtani – Fisk Electric and Telephone Company Limited, Saudi Arabia Position
– Outside Plant Engineer (OSP) Project:
Electrical and Instrumentation Works (Saudi Aramco Ras Tanura to Riyadh
Pipeline) Project
Summary : Installation of Electrical, Instrumentation
Control Cable from RTU to Valves Station, Overall installation
of Electrical and Instrumentation cables and equipment from
Switchgear to Primary Shipper and Booster Pump. Ø Project
Coordinator and Site Engineer for Electrical/Instrumentation RTDB-2/DR-2 Aramco Project. Ø Site Engineer,
responsible for all site Activities, Plan, Implementation and Coordination. Ø Evaluate
plans/drawing and do Estimates for Material Take-off, Material Quotation and Preparations of
Bid. Ø As Work permit
Reciever, receives permit prior to commencement of work. Sept 2008 – March 2010 Bayan Telecommunication – TranSwitch(NDO –
Gensan link Cluster Transmission/Switch Engineer Work Summary : Daily operation and Maintenance of
Transmission and Switching Equipment. Ø
Daily
O &M of transmission link and switch monitoring Ø
BTS O
& M (ZTE ZXU) Ø
Do
the troubleshooting of DFR/LL/IPVPN/DLL circuits 24x7 Ø
Monitoring
and do the generator back up of remote HRISLU-cabinets Ø
Monitoring
and maintenance of fiber link Ø
Do
the daily monitoring DSLAMS port monitoring and troubleshooting Ø
Do
the PMI of HO, remote cabinets, RCU and CDMA BTS Ø
Do
the initial troubleshooting of BTS alarms. Ø
Installation
of Ericcson IPDSLAM for DSL port allocation Ø
O
& M of PDH and SDH, conduct operational PMI of both Ø
Installation
of VSAT and ASI Correction Ø
Optimazation
and drive testing Jan 2008 – Sept 2008 Bayan – Customer Access Network (National
Data Operation) Outside Plant Engineer Ø
Prepare
plan for OSP expansion and extension(Visio) Ø
Inspect
OSP projects done by contractor Ø
Installation
of CCTV configuring connectivity thru web Ø
Conduct
inspection of Outside Plant facilities Ø
Do
the testing and acceptance of project billed by contractor Ø
Submit
monthly monitoring : finished projects and projects
that needs to be done in time Ø
monitor
daily trouble ticket especially data(DSL) Ø
Inspect
work done by contractor for final acceptance if pass with companys standard Ø
Design
and implement proper standards for OSP O and M Ø
Contractor
management from installation to Inspection Jan 2006 - Jan 2008 BayanTel – Gensan Customer
Access Network
DSL Install/Repair/Voice Over Internet
Protocol(VOIP)/ CDMA Ø Configure all VOIP routers with Different
ISP’s Such as Vonage Ø Install and configure PC for DSL (Digital
Subscriber Line). Ø Check for signal routing/coordination to
main server Ø Network/Structured cabling from server to
workstation Ø Configure Wireless/wired Router, Swicthes,
Hubs Ø Install & Configure VOIP (Voice over
IP) equipment (LINKSYS) Ø Install DSLAM Ø Configure routers/switch port Ø Install configure IP camera, Wireless
camera accessible thru Web Ø Install VOIP Ø Manage different types of IP
equipments such switch, routers, modems maintain its parameter and
configuration for its respective uses. Ø Configure IP Radio Parameters Ø 2.5G wireless CDMA 2000 technology
familiar Ø 5ESS Lucent switch Familiar commands and
parameter Ø Conduct testing on various type of telecom
equipment such router-modem, modem,voip. August 2003 – June
2004
BayanTel – Gensan Customer
Access Network
Dispatch Specialist
Ø Ensure proper dispatching of trouble/fault
tickets,service orders, area for survey to OSP technician. Ø Provide technical solution to any problem
that my hamper the quality service offered by the company. Ø Regularly monitor the flow service orders. Ø Present daily reports, it may be
beneficial or not, this is for enhancement of quality
service. Ø Project LEC expansion monitoring March 2003 – July
2003 BayanTel – Gensan Customer Access
Network
Facility Engineer
Ø
Conduct
wireline survey (staking) and outside plant engineering Ø
Install
And troubleshoot CTA(Cordless terminal Adaptor) Lucent technology Ø
Provides
facilities(Distribution Point location) prior to installation. Ø
Daily
update of plant database versus OSP/actual facility usage. Ø
Random
check up of OSP facility for preventive maintenance Ø
Generate
Service Orders for new Client. Ø
Inspect
newly installed lines if it submits to company’s standard. Ø
Survey
WLL(Wireless Local Loop) Received Signal Level using LUCENT pointing kit. Ø
Retest
used CTA(cordless terminal adaptor) for re-use. Ø
HRISLU/OPAC
clean up. Ø
Design/activate
OSP cable stump. Ø
Provides
technical support for OSP technician in troubleshooting WLL faults. Ø
Access
SNM(Swing Network Manager_Switching) for WLL activation.(Lucent) November 2002 – February 2004
BayanTel – Gensan Customer Access
Network
Outside Plant & Payphone Technician
Ø
Troubleshoot
CDMA Wireless local loop Set/receive Signal Level Ø
Ensure
24hrs Quick Response Guarantee must be observed always for regular LEC line. Ø
4 hrs
repair for DSL(digital subscriber line) & LL(Leased line)
on call even night time. Ø
install
telephone line WL(wireline) or WLL(wireless local loop) Ø
jumpering
of new line at MDF side must always be at 100% accuracy. Ø
Install
WLL Lucent Technology. Ø
Survey
& install analog radio using KRONE technology. Ø
Repair
PROTEL payphone, Card operated. Ø
Rectify
OSP grounding & testing using Earth Megger. Ø
Splice
secondary multi pair cable. Ø
Well
– oriented on different telecom equipment such dynatel,BERT ,OTDR, Thines. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|